Major Pharmaceutical Company - Live Flexi Lab Environment (Stevenage)In 2010 SPC Technical Services were awarded a contract to install the Cat 6 in a typical 1980’s building over 4 floors consisting of a mixture of live laboratories, write-up areas and administration areas. Client Requirements: Data cabling building upgrade consistin... View case study |
Bovis Lend Lease, Research FacilityA leading pharmaceutical company commissioned a new state of the art research development centre. Bovis Lend Lease was the main M&E contractor for this prestigious new development, and SPC Technical Services Ltd was successful in securing the voice and data works. The buildi... View case study |
|
|
Large Pharmaceutical Company: Ware Site-wide Technical Refresh ProjectA leading pharmaceutical company commissioned a full Technical Refresh upgrade of their Ware site to Krone fibre optical backbone BS: standards over a 4 month period, with all 7 main and several smaller older-style buildings all to be included. As Main Contractor, SPC Technica... View case study |
Leading Pharmaceutical Company: Network Core SwitchesA typical example of our data centre services is a recent project to provide the latest generation of high availability network services for their R&D sites. The Network Core switches in the Computer Room were to be replaced. These were integral to the UK and global operations... View case study |
|
|
Large Pharmaceutical Company: Data Small Works ContractWhen a leading pharmaceutical company were looking for a data cabling company at their Stevenage,Ware andHarlow sites, SPC Technical Services Ltd was awarded the ’small works’ contract for these sites and also at Brentford, Berkeley Square and Stockley Park Since that time SPC Te... View case study |
Large Pharmaceutical Company: Fire AlarmIn 2009 SPC Technical Services Ltd were engaged to replace an out of date fire alarm system within a satellite building at a large site near Welwyn, Hertfordshire. The new bespoke fire alarm system was designed to facilitate the complicated requirements of the building and int... View case study |
|
|
Wireless SolutionsS.P.C. Technical Services Ltd. provides the full range of wireless solutions, from specialist wireless survey service, to WLAN installations, to installations offering bandwidth capacity encompassing 2mbps links to 155mbps and above. The scale of these installations is vast: ... View case study |
|
|
Major Pharmaceutical Company - Power Quality ProjectA Harmonic Analysis was carried out at a major pharmaceutical company to determine compliance with Energy Networks Association Engineering Recommendation G5/4-1. The intention of the Energy Networks Association Recommendation G5/4, first published in 2001, was to try to ensure... View case study |